Bathroom Fitters Agree: Tile First, Then Toilet
When it comes to bathroom renovations, homeowners frequently wonder about the order in which the toilet and tiles should be installed. The experts have spoken, and they all agree that tiling the floor first ensures a high-quality finish that prevents water damage. This method ensures a smooth appearance with no awkward edges or gaps around fixtures such as the toilet. It also improves precision when cutting tiles to fit around awkward corners or odd-shaped spaces in your bathroom.
The vast majority of plumbers agree that tiling should be completed prior to installing your toilet. There are several reasons for this, including:
1. Because tiling takes more time than installing a toilet, it makes sense to get it done first.
2. If there are any tiling issues (e.g., cracks or unevenness), it will be easier to fix them before installing the toilet.
3. Installing a toilet after tiling eliminates the risk of tile grout getting on your toilet bowl or seat.
4. When there is no tile in the way, it is generally easier to install a toilet.
5. To avoid potential issues, ensure that the flange is level before tiling around it.
So, if you’re thinking about remodeling your bathroom, remember this simple rule: tile first, then install the toilet. For years to come, your finished product will be both aesthetically pleasing and functional!
The Advantages of Installing Tile First
There are numerous advantages to installing tile first in your bathroom renovation. Tile is a long-lasting and water-resistant material that will keep your walls dry. It is also simple to clean and maintain, making it an excellent choice for a crowded bathroom.
Toilet installation is a difficult process that should be left to the professionals. However, by laying tile first, you can create a smooth and level surface on which to install the toilet. This ensures a good fit and prevents leaks or water damage.
A beautiful finishing touch to any bathroom is tile. It is available in a variety of colors and styles, allowing you to create the ideal look for your space. Tile can help you achieve the design you want, whether it’s a classic white subway tile or something more unique.
Floor Tiling Steps That Work
There is a specific order that should be followed when tiling your bathroom floor to ensure the best results. First, arrange all of your tiles on the floor in the desired pattern. This will assist you in visualizing the finished product and determining any cuts that are required.
Next, draw straight lines where your tile rows will begin and end with a level and chalk line. This will help ensure that your tile rows are even and that your tiles are properly laid.
It’s now time to begin laying the tile. Begin by spreading mortar with a notched trowel across the floor, beginning at one of your chalk lines. Then, working from the outside inward to avoid getting stuck in a corner, set the tile into the mortar. To keep even grout lines, use spacers between each tile.
Allow all of the tiles to dry for 24 hours before grouting. To grout, follow the manufacturer’s instructions and spread the grout into the joints with a rubber float held at a 45-degree angle. Wipe away any excess grout with a damp sponge and wait 24 hours before walking on it or using the shower or tub.